One entry per registered generating unit, in registration order. This page is deliberately long: the whole of it does not fit in a transcript, and the entry a question asks about is usually in the middle, which is the part a bounded cut removes. Read the section you need out of the stored result rather than asking for more of the page.

Register entry 001

Entry 001 was commissioned in 2001 and is rated at 67 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 002

Entry 002 was commissioned in 2002 and is rated at 74 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 003

Entry 003 was commissioned in 2003 and is rated at 81 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 004

Entry 004 was commissioned in 2004 and is rated at 88 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 005

Entry 005 was commissioned in 2005 and is rated at 95 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 006

Entry 006 was commissioned in 2006 and is rated at 102 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 007

Entry 007 was commissioned in 2007 and is rated at 109 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 008

Entry 008 was commissioned in 2008 and is rated at 116 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 009

Entry 009 was commissioned in 2009 and is rated at 123 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 010

Entry 010 was commissioned in 2010 and is rated at 130 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 011

Entry 011 was commissioned in 2011 and is rated at 137 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 012

Entry 012 was commissioned in 2012 and is rated at 144 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 013

Entry 013 was commissioned in 2013 and is rated at 151 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 014

Entry 014 was commissioned in 2014 and is rated at 158 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 015

Entry 015 was commissioned in 2015 and is rated at 165 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 016

Entry 016 was commissioned in 2016 and is rated at 172 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 017

Entry 017 was commissioned in 2017 and is rated at 179 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 018

Entry 018 was commissioned in 2018 and is rated at 186 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 019

Entry 019 was commissioned in 2019 and is rated at 193 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 020

Entry 020 was commissioned in 2020 and is rated at 200 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 021

Entry 021 was commissioned in 2021 and is rated at 207 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 022

Entry 022 was commissioned in 2022 and is rated at 214 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 023

Entry 023 was commissioned in 2023 and is rated at 221 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 024

Entry 024 was commissioned in 2024 and is rated at 228 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 025

Entry 025 was commissioned in 2000 and is rated at 235 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 026

Entry 026 was commissioned in 2001 and is rated at 242 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 027

Entry 027 was commissioned in 2002 and is rated at 249 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 028

Entry 028 was commissioned in 2003 and is rated at 256 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 029

Entry 029 was commissioned in 2004 and is rated at 263 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 030

Entry 030 was commissioned in 2005 and is rated at 270 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 031

Entry 031 was commissioned in 2006 and is rated at 277 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 032

Entry 032 was commissioned in 2007 and is rated at 284 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 033

Entry 033 was commissioned in 2008 and is rated at 291 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 034

Entry 034 was commissioned in 2009 and is rated at 298 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 035

Entry 035 was commissioned in 2010 and is rated at 305 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 036

Entry 036 was commissioned in 2011 and is rated at 312 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 037

Entry 037 was commissioned in 2012 and is rated at 319 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 038

Entry 038 was commissioned in 2013 and is rated at 326 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 039

Entry 039 was commissioned in 2014 and is rated at 333 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 040

Entry 040 was commissioned in 2015 and is rated at 340 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 041

Entry 041 was commissioned in 2016 and is rated at 347 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 042

Entry 042 was commissioned in 2017 and is rated at 354 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 043

Entry 043 was commissioned in 2018 and is rated at 61 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 044

Entry 044 was commissioned in 2019 and is rated at 68 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 045

Entry 045 was commissioned in 2020 and is rated at 75 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 046

Entry 046 was commissioned in 2021 and is rated at 82 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 047

Entry 047 was commissioned in 2022 and is rated at 89 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 048

Entry 048 was commissioned in 2023 and is rated at 96 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 049

Entry 049 was commissioned in 2024 and is rated at 103 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 050

Entry 050 was commissioned in 2000 and is rated at 110 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 051

Entry 051 was commissioned in 2001 and is rated at 117 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 052

Entry 052 was commissioned in 2002 and is rated at 124 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 053

Entry 053 was commissioned in 2003 and is rated at 131 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 054

Entry 054 was commissioned in 2004 and is rated at 138 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 055

Entry 055 was commissioned in 2005 and is rated at 145 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 056

Entry 056 was commissioned in 2006 and is rated at 152 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 057

Entry 057 was commissioned in 2007 and is rated at 159 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 058

Entry 058 was commissioned in 2008 and is rated at 166 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 059

Entry 059 was commissioned in 2009 and is rated at 173 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 060

Entry 060 was commissioned in 2010 and is rated at 180 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 061

Entry 061 was commissioned in 2011 and is rated at 187 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 062

Entry 062 was commissioned in 2012 and is rated at 194 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 063

Entry 063 was commissioned in 2013 and is rated at 201 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 064

Entry 064 was commissioned in 2014 and is rated at 208 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 065

Entry 065 was commissioned in 2015 and is rated at 215 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 066

Entry 066 was commissioned in 2016 and is rated at 222 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 067

Entry 067 was commissioned in 2017 and is rated at 229 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 068

Entry 068 was commissioned in 2018 and is rated at 236 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 069

Entry 069 was commissioned in 2019 and is rated at 243 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 070

Entry 070 was commissioned in 2020 and is rated at 250 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 071

Entry 071 was commissioned in 2021 and is rated at 257 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 072

Entry 072 was commissioned in 2022 and is rated at 264 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 073

Entry 073 was commissioned in 2023 and is rated at 271 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 074

Entry 074 was commissioned in 2024 and is rated at 278 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 075

Entry 075 was commissioned in 2000 and is rated at 285 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 076

Entry 076 was commissioned in 2001 and is rated at 292 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 077

Entry 077 was commissioned in 2002 and is rated at 299 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 078

Entry 078 was commissioned in 2003 and is rated at 306 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 079

Entry 079 was commissioned in 2004 and is rated at 313 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 080

Entry 080 was commissioned in 2005 and is rated at 320 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 081

Entry 081 was commissioned in 2006 and is rated at 327 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 082

Entry 082 was commissioned in 2007 and is rated at 334 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 083

Entry 083 was commissioned in 2008 and is rated at 341 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 084

Entry 084 was commissioned in 2009 and is rated at 348 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 085

Entry 085 was commissioned in 2010 and is rated at 355 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 086

Entry 086 was commissioned in 2011 and is rated at 62 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 087

Entry 087 was commissioned in 2012 and is rated at 69 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 088

Entry 088 was commissioned in 2013 and is rated at 76 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 089

Entry 089 was commissioned in 2014 and is rated at 83 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 090

Entry 090 was commissioned in 2015 and is rated at 90 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 091

Entry 091 was commissioned in 2016 and is rated at 97 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 092

Entry 092 was commissioned in 2017 and is rated at 104 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 093

Entry 093 was commissioned in 2018 and is rated at 111 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 094

Entry 094 was commissioned in 2019 and is rated at 118 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 095

Entry 095 was commissioned in 2020 and is rated at 125 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 096

Entry 096 was commissioned in 2021 and is rated at 132 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 097

Entry 097 was commissioned in 2022 and is rated at 139 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 098

Entry 098 was commissioned in 2023 and is rated at 146 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 099

Entry 099 was commissioned in 2024 and is rated at 153 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 100

Entry 100 was commissioned in 2000 and is rated at 160 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 101

Entry 101 was commissioned in 2001 and is rated at 167 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 102

Entry 102 was commissioned in 2002 and is rated at 174 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 103

Entry 103 was commissioned in 2003 and is rated at 181 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 104

Entry 104 was commissioned in 2004 and is rated at 188 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 105

Entry 105 was commissioned in 2005 and is rated at 195 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 106

Entry 106 was commissioned in 2006 and is rated at 202 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 107

Entry 107 was commissioned in 2007 and is rated at 209 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 108

Entry 108 was commissioned in 2008 and is rated at 216 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 109

Entry 109 was commissioned in 2009 and is rated at 223 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 110

Entry 110 was commissioned in 2010 and is rated at 230 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 111

Entry 111 was commissioned in 2011 and is rated at 237 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 112

Entry 112 was commissioned in 2012 and is rated at 244 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 113

Entry 113 was commissioned in 2013 and is rated at 251 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 114

Entry 114 was commissioned in 2014 and is rated at 258 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 115

Entry 115 was commissioned in 2015 and is rated at 265 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 116

Entry 116 was commissioned in 2016 and is rated at 272 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 117

Entry 117 was commissioned in 2017 and is rated at 279 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 118

Entry 118 was commissioned in 2018 and is rated at 286 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 119

Entry 119 was commissioned in 2019 and is rated at 293 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 120

Entry 120 was commissioned in 2020 and is rated at 300 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 121

Entry 121 was commissioned in 2021 and is rated at 307 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 122

Entry 122 was commissioned in 2022 and is rated at 314 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 123

Entry 123 was commissioned in 2023 and is rated at 321 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 124

Entry 124 was commissioned in 2024 and is rated at 328 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 125

Entry 125 was commissioned in 2000 and is rated at 335 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 126

Entry 126 was commissioned in 2001 and is rated at 342 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 127

Entry 127 was commissioned in 2002 and is rated at 349 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 128

Entry 128 was commissioned in 2003 and is rated at 356 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 129

Entry 129 was commissioned in 2004 and is rated at 63 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 130

Entry 130 was commissioned in 2005 and is rated at 70 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 131

Entry 131 was commissioned in 2006 and is rated at 77 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 132

Entry 132 was commissioned in 2007 and is rated at 84 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 133

Entry 133 was commissioned in 2008 and is rated at 91 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 134

Entry 134 was commissioned in 2009 and is rated at 98 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 135

Entry 135 was commissioned in 2010 and is rated at 105 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 136

Entry 136 was commissioned in 2011 and is rated at 112 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 137

Entry 137 was commissioned in 2012 and is rated at 119 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 138

Entry 138 was commissioned in 2013 and is rated at 126 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 139

Entry 139 was commissioned in 2014 and is rated at 133 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 140

Entry 140 was commissioned in 2015 and is rated at 140 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 141

Entry 141 was commissioned in 2016 and is rated at 147 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 142

Entry 142 was commissioned in 2017 and is rated at 154 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 143

Entry 143 was commissioned in 2018 and is rated at 161 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 144

Entry 144 was commissioned in 2019 and is rated at 168 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 145

Entry 145 was commissioned in 2020 and is rated at 175 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 146

Entry 146 was commissioned in 2021 and is rated at 182 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 147

Entry 147 was commissioned in 2022 and is rated at 189 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 148

Entry 148 was commissioned in 2023 and is rated at 196 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 149

Entry 149 was commissioned in 2024 and is rated at 203 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 150

Entry 150 was commissioned in 2000 and is rated at 210 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 151

Entry 151 was commissioned in 2001 and is rated at 217 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 152

Entry 152 was commissioned in 2002 and is rated at 224 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 153

Entry 153 was commissioned in 2003 and is rated at 231 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 154

Entry 154 was commissioned in 2004 and is rated at 238 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 155

Entry 155 was commissioned in 2005 and is rated at 245 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 156

Entry 156 was commissioned in 2006 and is rated at 252 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 157

Entry 157 was commissioned in 2007 and is rated at 259 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 158

Entry 158 was commissioned in 2008 and is rated at 266 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 159

Entry 159 was commissioned in 2009 and is rated at 273 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 160

Entry 160 was commissioned in 2010 and is rated at 280 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 161

Entry 161 was commissioned in 2011 and is rated at 287 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 162

Entry 162 was commissioned in 2012 and is rated at 294 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 163

Entry 163 was commissioned in 2013 and is rated at 301 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 164

Entry 164 was commissioned in 2014 and is rated at 308 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 165

Entry 165 was commissioned in 2015 and is rated at 315 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 166

Entry 166 was commissioned in 2016 and is rated at 322 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 167

Entry 167 was commissioned in 2017 and is rated at 329 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 168

Entry 168 was commissioned in 2018 and is rated at 336 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 169

Entry 169 was commissioned in 2019 and is rated at 343 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 170

Entry 170 was commissioned in 2020 and is rated at 350 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 171

Entry 171 was commissioned in 2021 and is rated at 357 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 172

Entry 172 was commissioned in 2022 and is rated at 64 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 173

Entry 173 was commissioned in 2023 and is rated at 71 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 174

Entry 174 was commissioned in 2024 and is rated at 78 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 175

Entry 175 was commissioned in 2000 and is rated at 85 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 176

Entry 176 was commissioned in 2001 and is rated at 92 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 177

Entry 177 was commissioned in 2002 and is rated at 99 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 178

Entry 178 was commissioned in 2003 and is rated at 106 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 179

Entry 179 was commissioned in 2004 and is rated at 113 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 180

Entry 180 was commissioned in 2005 and is rated at 120 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 181

Entry 181 was commissioned in 2006 and is rated at 127 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 182

Entry 182 was commissioned in 2007 and is rated at 134 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 183

Entry 183 was commissioned in 2008 and is rated at 141 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 184

Entry 184 was commissioned in 2009 and is rated at 148 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 185

Entry 185 was commissioned in 2010 and is rated at 155 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 186

Entry 186 was commissioned in 2011 and is rated at 162 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 187

Entry 187 was commissioned in 2012 and is rated at 169 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 188

Entry 188 was commissioned in 2013 and is rated at 176 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 189

Entry 189 was commissioned in 2014 and is rated at 183 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 190

Entry 190 was commissioned in 2015 and is rated at 190 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 191

Entry 191 was commissioned in 2016 and is rated at 197 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 192

Entry 192 was commissioned in 2017 and is rated at 204 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 193

Entry 193 was commissioned in 2018 and is rated at 211 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 194

Entry 194 was commissioned in 2019 and is rated at 218 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 195

Entry 195 was commissioned in 2020 and is rated at 225 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 196

Entry 196 was commissioned in 2021 and is rated at 232 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 197

Entry 197 was commissioned in 2022 and is rated at 239 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 198

Entry 198 was commissioned in 2023 and is rated at 246 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 199

Entry 199 was commissioned in 2024 and is rated at 253 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 200

Entry 200 was commissioned in 2000 and is rated at 145 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 201

Entry 201 was commissioned in 2001 and is rated at 267 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 202

Entry 202 was commissioned in 2002 and is rated at 274 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 203

Entry 203 was commissioned in 2003 and is rated at 281 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 204

Entry 204 was commissioned in 2004 and is rated at 288 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 205

Entry 205 was commissioned in 2005 and is rated at 295 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 206

Entry 206 was commissioned in 2006 and is rated at 302 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 207

Entry 207 was commissioned in 2007 and is rated at 309 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 208

Entry 208 was commissioned in 2008 and is rated at 316 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 209

Entry 209 was commissioned in 2009 and is rated at 323 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 210

Entry 210 was commissioned in 2010 and is rated at 330 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 211

Entry 211 was commissioned in 2011 and is rated at 337 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 212

Entry 212 was commissioned in 2012 and is rated at 344 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 213

Entry 213 was commissioned in 2013 and is rated at 351 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 214

Entry 214 was commissioned in 2014 and is rated at 358 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 215

Entry 215 was commissioned in 2015 and is rated at 65 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 216

Entry 216 was commissioned in 2016 and is rated at 72 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 217

Entry 217 was commissioned in 2017 and is rated at 79 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 218

Entry 218 was commissioned in 2018 and is rated at 86 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 219

Entry 219 was commissioned in 2019 and is rated at 93 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 220

Entry 220 was commissioned in 2020 and is rated at 100 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 221

Entry 221 was commissioned in 2021 and is rated at 107 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 222

Entry 222 was commissioned in 2022 and is rated at 114 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 223

Entry 223 was commissioned in 2023 and is rated at 121 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 224

Entry 224 was commissioned in 2024 and is rated at 128 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 225

Entry 225 was commissioned in 2000 and is rated at 135 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 226

Entry 226 was commissioned in 2001 and is rated at 142 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 227

Entry 227 was commissioned in 2002 and is rated at 149 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 228

Entry 228 was commissioned in 2003 and is rated at 156 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 229

Entry 229 was commissioned in 2004 and is rated at 163 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 230

Entry 230 was commissioned in 2005 and is rated at 170 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 231

Entry 231 was commissioned in 2006 and is rated at 177 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 232

Entry 232 was commissioned in 2007 and is rated at 184 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 233

Entry 233 was commissioned in 2008 and is rated at 191 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 234

Entry 234 was commissioned in 2009 and is rated at 198 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 235

Entry 235 was commissioned in 2010 and is rated at 205 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 236

Entry 236 was commissioned in 2011 and is rated at 212 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 237

Entry 237 was commissioned in 2012 and is rated at 219 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 238

Entry 238 was commissioned in 2013 and is rated at 226 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 239

Entry 239 was commissioned in 2014 and is rated at 233 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 240

Entry 240 was commissioned in 2015 and is rated at 240 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 241

Entry 241 was commissioned in 2016 and is rated at 247 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 242

Entry 242 was commissioned in 2017 and is rated at 254 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 243

Entry 243 was commissioned in 2018 and is rated at 261 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 244

Entry 244 was commissioned in 2019 and is rated at 268 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 245

Entry 245 was commissioned in 2020 and is rated at 275 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 246

Entry 246 was commissioned in 2021 and is rated at 282 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 247

Entry 247 was commissioned in 2022 and is rated at 289 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 248

Entry 248 was commissioned in 2023 and is rated at 296 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 249

Entry 249 was commissioned in 2024 and is rated at 303 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 250

Entry 250 was commissioned in 2000 and is rated at 310 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 251

Entry 251 was commissioned in 2001 and is rated at 317 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 252

Entry 252 was commissioned in 2002 and is rated at 324 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 253

Entry 253 was commissioned in 2003 and is rated at 331 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 254

Entry 254 was commissioned in 2004 and is rated at 338 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 255

Entry 255 was commissioned in 2005 and is rated at 345 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 256

Entry 256 was commissioned in 2006 and is rated at 352 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 257

Entry 257 was commissioned in 2007 and is rated at 359 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 258

Entry 258 was commissioned in 2008 and is rated at 66 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 259

Entry 259 was commissioned in 2009 and is rated at 73 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 260

Entry 260 was commissioned in 2010 and is rated at 80 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 261

Entry 261 was commissioned in 2011 and is rated at 87 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 262

Entry 262 was commissioned in 2012 and is rated at 94 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 263

Entry 263 was commissioned in 2013 and is rated at 101 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 264

Entry 264 was commissioned in 2014 and is rated at 108 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 265

Entry 265 was commissioned in 2015 and is rated at 115 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 266

Entry 266 was commissioned in 2016 and is rated at 122 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 267

Entry 267 was commissioned in 2017 and is rated at 129 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 268

Entry 268 was commissioned in 2018 and is rated at 136 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 269

Entry 269 was commissioned in 2019 and is rated at 143 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 270

Entry 270 was commissioned in 2020 and is rated at 150 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 271

Entry 271 was commissioned in 2021 and is rated at 157 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 272

Entry 272 was commissioned in 2022 and is rated at 164 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 273

Entry 273 was commissioned in 2023 and is rated at 171 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 274

Entry 274 was commissioned in 2024 and is rated at 178 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 275

Entry 275 was commissioned in 2000 and is rated at 185 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 276

Entry 276 was commissioned in 2001 and is rated at 192 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 277

Entry 277 was commissioned in 2002 and is rated at 199 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 278

Entry 278 was commissioned in 2003 and is rated at 206 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 279

Entry 279 was commissioned in 2004 and is rated at 213 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 280

Entry 280 was commissioned in 2005 and is rated at 220 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 281

Entry 281 was commissioned in 2006 and is rated at 227 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 282

Entry 282 was commissioned in 2007 and is rated at 234 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 283

Entry 283 was commissioned in 2008 and is rated at 241 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 284

Entry 284 was commissioned in 2009 and is rated at 248 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 285

Entry 285 was commissioned in 2010 and is rated at 255 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 286

Entry 286 was commissioned in 2011 and is rated at 262 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 287

Entry 287 was commissioned in 2012 and is rated at 269 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 288

Entry 288 was commissioned in 2013 and is rated at 276 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 289

Entry 289 was commissioned in 2014 and is rated at 283 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 290

Entry 290 was commissioned in 2015 and is rated at 290 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 291

Entry 291 was commissioned in 2016 and is rated at 297 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 292

Entry 292 was commissioned in 2017 and is rated at 304 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 293

Entry 293 was commissioned in 2018 and is rated at 311 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 294

Entry 294 was commissioned in 2019 and is rated at 318 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 295

Entry 295 was commissioned in 2020 and is rated at 325 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 296

Entry 296 was commissioned in 2021 and is rated at 332 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 297

Entry 297 was commissioned in 2022 and is rated at 339 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 298

Entry 298 was commissioned in 2023 and is rated at 346 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 299

Entry 299 was commissioned in 2024 and is rated at 353 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 300

Entry 300 was commissioned in 2000 and is rated at 60 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 301

Entry 301 was commissioned in 2001 and is rated at 67 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 302

Entry 302 was commissioned in 2002 and is rated at 74 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 303

Entry 303 was commissioned in 2003 and is rated at 81 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 304

Entry 304 was commissioned in 2004 and is rated at 88 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 305

Entry 305 was commissioned in 2005 and is rated at 95 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 306

Entry 306 was commissioned in 2006 and is rated at 102 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 307

Entry 307 was commissioned in 2007 and is rated at 109 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 308

Entry 308 was commissioned in 2008 and is rated at 116 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 309

Entry 309 was commissioned in 2009 and is rated at 123 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 310

Entry 310 was commissioned in 2010 and is rated at 130 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 311

Entry 311 was commissioned in 2011 and is rated at 137 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 312

Entry 312 was commissioned in 2012 and is rated at 144 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 313

Entry 313 was commissioned in 2013 and is rated at 151 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 314

Entry 314 was commissioned in 2014 and is rated at 158 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 315

Entry 315 was commissioned in 2015 and is rated at 165 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 316

Entry 316 was commissioned in 2016 and is rated at 172 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 317

Entry 317 was commissioned in 2017 and is rated at 179 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 318

Entry 318 was commissioned in 2018 and is rated at 186 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 319

Entry 319 was commissioned in 2019 and is rated at 193 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 320

Entry 320 was commissioned in 2020 and is rated at 200 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 321

Entry 321 was commissioned in 2021 and is rated at 207 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 322

Entry 322 was commissioned in 2022 and is rated at 214 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 323

Entry 323 was commissioned in 2023 and is rated at 221 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 324

Entry 324 was commissioned in 2024 and is rated at 228 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 325

Entry 325 was commissioned in 2000 and is rated at 235 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 326

Entry 326 was commissioned in 2001 and is rated at 242 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 327

Entry 327 was commissioned in 2002 and is rated at 249 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 328

Entry 328 was commissioned in 2003 and is rated at 256 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 329

Entry 329 was commissioned in 2004 and is rated at 263 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 330

Entry 330 was commissioned in 2005 and is rated at 270 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 331

Entry 331 was commissioned in 2006 and is rated at 277 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 332

Entry 332 was commissioned in 2007 and is rated at 284 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 333

Entry 333 was commissioned in 2008 and is rated at 291 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 334

Entry 334 was commissioned in 2009 and is rated at 298 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 335

Entry 335 was commissioned in 2010 and is rated at 305 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 336

Entry 336 was commissioned in 2011 and is rated at 312 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 337

Entry 337 was commissioned in 2012 and is rated at 319 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 338

Entry 338 was commissioned in 2013 and is rated at 326 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 339

Entry 339 was commissioned in 2014 and is rated at 333 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 340

Entry 340 was commissioned in 2015 and is rated at 340 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 341

Entry 341 was commissioned in 2016 and is rated at 347 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 342

Entry 342 was commissioned in 2017 and is rated at 354 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 343

Entry 343 was commissioned in 2018 and is rated at 61 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 344

Entry 344 was commissioned in 2019 and is rated at 68 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 345

Entry 345 was commissioned in 2020 and is rated at 75 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 346

Entry 346 was commissioned in 2021 and is rated at 82 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 347

Entry 347 was commissioned in 2022 and is rated at 89 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 348

Entry 348 was commissioned in 2023 and is rated at 96 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 349

Entry 349 was commissioned in 2024 and is rated at 103 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 350

Entry 350 was commissioned in 2000 and is rated at 110 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 351

Entry 351 was commissioned in 2001 and is rated at 117 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 352

Entry 352 was commissioned in 2002 and is rated at 124 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 353

Entry 353 was commissioned in 2003 and is rated at 131 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 354

Entry 354 was commissioned in 2004 and is rated at 138 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 355

Entry 355 was commissioned in 2005 and is rated at 145 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 356

Entry 356 was commissioned in 2006 and is rated at 152 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 357

Entry 357 was commissioned in 2007 and is rated at 159 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 358

Entry 358 was commissioned in 2008 and is rated at 166 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 359

Entry 359 was commissioned in 2009 and is rated at 173 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 360

Entry 360 was commissioned in 2010 and is rated at 180 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 361

Entry 361 was commissioned in 2011 and is rated at 187 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 362

Entry 362 was commissioned in 2012 and is rated at 194 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 363

Entry 363 was commissioned in 2013 and is rated at 201 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 364

Entry 364 was commissioned in 2014 and is rated at 208 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 365

Entry 365 was commissioned in 2015 and is rated at 215 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 366

Entry 366 was commissioned in 2016 and is rated at 222 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 367

Entry 367 was commissioned in 2017 and is rated at 229 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 368

Entry 368 was commissioned in 2018 and is rated at 236 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 369

Entry 369 was commissioned in 2019 and is rated at 243 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 370

Entry 370 was commissioned in 2020 and is rated at 250 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 371

Entry 371 was commissioned in 2021 and is rated at 257 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 372

Entry 372 was commissioned in 2022 and is rated at 264 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 373

Entry 373 was commissioned in 2023 and is rated at 271 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 374

Entry 374 was commissioned in 2024 and is rated at 278 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 375

Entry 375 was commissioned in 2000 and is rated at 285 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 376

Entry 376 was commissioned in 2001 and is rated at 292 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 377

Entry 377 was commissioned in 2002 and is rated at 299 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 378

Entry 378 was commissioned in 2003 and is rated at 306 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 379

Entry 379 was commissioned in 2004 and is rated at 313 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 380

Entry 380 was commissioned in 2005 and is rated at 320 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 381

Entry 381 was commissioned in 2006 and is rated at 327 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 382

Entry 382 was commissioned in 2007 and is rated at 334 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 383

Entry 383 was commissioned in 2008 and is rated at 341 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 384

Entry 384 was commissioned in 2009 and is rated at 348 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 385

Entry 385 was commissioned in 2010 and is rated at 355 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 386

Entry 386 was commissioned in 2011 and is rated at 62 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 387

Entry 387 was commissioned in 2012 and is rated at 69 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 388

Entry 388 was commissioned in 2013 and is rated at 76 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 389

Entry 389 was commissioned in 2014 and is rated at 83 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 390

Entry 390 was commissioned in 2015 and is rated at 90 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 391

Entry 391 was commissioned in 2016 and is rated at 97 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 392

Entry 392 was commissioned in 2017 and is rated at 104 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 393

Entry 393 was commissioned in 2018 and is rated at 111 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 394

Entry 394 was commissioned in 2019 and is rated at 118 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 395

Entry 395 was commissioned in 2020 and is rated at 125 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 396

Entry 396 was commissioned in 2021 and is rated at 132 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 397

Entry 397 was commissioned in 2022 and is rated at 139 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 398

Entry 398 was commissioned in 2023 and is rated at 146 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 399

Entry 399 was commissioned in 2024 and is rated at 153 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Register entry 400

Entry 400 was commissioned in 2000 and is rated at 160 kW. Its metering point is unchanged since registration and it reported for the whole of the 2025 operating year. No re-rating, transfer or withdrawal was recorded against this entry during the reporting period, and the register carries no further remark about it.

Totals

400 entries were registered at year end.