Absorbed energy, baseline, at 100 ms: 176.5 kJ

| # | Part | kJ | Share | Cumulative | 10/50/90 % at ms | Hourglass |
| --- | --- | --- | --- | --- | --- | --- |
| 1 | Front rail LH (120) | 32.65 | 18.5 % | 18.5 % | 15.6 / 23.7 / 35.8 | 2.0 % |
| 2 | Front rail RH (121) | 32.65 | 18.5 % | 37.0 % | 15.6 / 23.7 / 35.8 | 2.0 % |
| 3 | Subframe (152) | 31.48 | 17.8 % | 54.9 % | 17.9 / 25.8 / 38.1 | 2.0 % |
| 4 | Upper rail LH (140) | 16.31 | 9.2 % | 64.1 % | 6.29 / 17.3 / 34.5 | 2.0 % |
| 5 | Upper rail RH (141) | 16.31 | 9.2 % | 73.3 % | 6.29 / 17.3 / 34.5 | 2.0 % |
| 6 | Crash box LH (110) | 14.91 | 8.4 % | 81.8 % | 3.59 / 7.89 / 12.5 | 3.1 % |
| 7 | Crash box RH (111) | 14.91 | 8.4 % | 90.2 % | 3.59 / 7.89 / 12.5 | 3.1 % |
| 8 | Subframe extension LH (150) | 4.81 | 2.7 % | 93.0 % | 6.79 / 10.8 / 15.0 | 3.1 % |

| Group | kJ | Share | 10/50/90 % at ms |
| --- | --- | --- | --- |
| bumper | 3.56 | 2.0 % | 0.287 / 1.34 / 2.38 |
| crash boxes | 29.81 | 16.9 % | 3.59 / 7.89 / 12.5 |
| front rails | 65.31 | 37.0 % | 15.6 / 23.7 / 35.8 |
| rear rails | 4.04 | 2.3 % | 42.1 / 43.4 / 45.3 |
| upper rails | 32.62 | 18.5 % | 6.29 / 17.3 / 34.5 |
| lower path | 41.11 | 23.3 % | 9.92 / 22.5 / 36.7 |

Energy absorbed by group over time (kJ):
    ms       bumper  crash boxes  front rails   rear rails  upper rails   lower path
     5          3.6          6.8          0.0          0.0          1.5          0.0
    10          3.6         20.4          0.1          0.1          7.8          4.2
    20          3.7         29.9         21.8          0.1         18.9         16.7
    30          3.7         29.9         48.0          0.1         27.0         30.9
    40          3.7         29.9         63.8          0.1         31.7         39.3
    60          3.6         29.8         65.3          4.0         32.6         41.1

Section forces: component {'x'}, CFC 60; sign reversed for 8 of 10 sections (their normals point forwards)
section                   peak kN  at ms  mean kN    kN ms  from-to ms
Crash box LH                249.6   44.4    144.6     7491   0.8-52.6
Front rail LH               248.9   44.4    144.1     7466   0.8-52.6
Rear rail LH                241.0   44.4    139.3     7217   0.8-52.6
Upper rail LH                49.5   35.8     41.9     2096   2.2-52.2
Subframe extension LH        85.8   36.8     64.6     3021   4.8-51.6

Load split, baseline:
  upper       16.7 % (target 20 % ± 5)  impulse 4192 kN ms, peak 98.97 kN
  middle      59.3 % (target 55 % ± 5)  impulse 14931 kN ms, peak 497.8 kN
  lower       24.0 % (target 25 % ± 5)  impulse 6042 kN ms, peak 171.7 kN
  at 35 ms: upper 18 %, middle 50 %, lower 31 %

main rail LH: in order
  Bumper beam 0.287 ms -> Crash box LH 3.59 ms -> Front rail LH 15.6 ms -> Rear rail LH 42.1 ms
main rail RH: in order
  Bumper beam 0.287 ms -> Crash box RH 3.59 ms -> Front rail RH 15.6 ms -> Rear rail RH 42.1 ms
